Mining Farm Area: 40,000 ㎡
Total Power Load: 150 MW
Operating Power Load: 82.5 MW

Ohio data center has 40,000 square meters of floor space, with an operating power load of 82.5MW, and can host up to 30,000 Bitcoin mining machines. The data center is fully staffed with an experienced operations and mining machine maintenance team, who have multiple years of experience operating crypto-mining datacenters.

finalminingfarmtour4k cover

24/7 Uninterrupted
Cooling and Stable Operation

Optimized Mining Infrastructure
Engineered with advanced thermal management, precision spacing, and a high-flow dual-intake ventilation system.

Interior view of a professional crypto mining facility with optimized ventilation
mining cooling system fans 3
StandardHash technical team discussing mining operations in the office
standardhash team at mining center 2
High-voltage power transformer and electrical infrastructure for mining
Outdoor view of the mining site power substation and electrical grid
Download StandardHash App

Scan the QR code or tap your store below

app store
App Store

Scan to install on iPhone

google play
Google Play

Scan to install on Android